What we achieved in 12 months

I look at my green walls and rotten flooring in the living room and I think wow! still so much to do! But all things considered, we achieved a lot in 12 months and I feel more than some people would do in years.

This is what we did.

  • March 2011: new boiler (moved from kitchen to garage)
  • March: New front door+ small window and new kitchen windows
  • July: Indoor shutters to replace curtains and protect from sunlight
  • July: new kitchen (everything gutted, new electricity, new floor, plastered wall, false ceiling for dim lights, new appliances, sink, unit, table
  • August: new bathroom (broke small loo into big bathroom, removed hot water tank, gut all bathroom, new sink, bath, toilet, remote controlled shower, new flooring and plastered wall.
  • January 2012: new windows upstairs: bathroom, corridor and 3 bedrooms.

Next project? finding a fridge.